MANUFACTURING
More capacity from the plant you already have
12-hour, rotating and 24/7 shift schedules that unlock capacity, flex with demand, cut overtime and keep your best people.

The challenge
Lean manufacturing squeezed out excess capacity and inventory, and now managers change schedules at the last minute to keep up with production swings. Employees bear the brunt, and margins shrink under hidden, unmeasured costs. Traditional schedules match demand in 40-hour increments (day shift, then afternoons, then nights, then a fourth crew), so when the workload lands between those steps, you pay for it in overtime, idle time, turnover and capital you may not need to spend.
How we help
Analyze your lines, overtime, absenteeism and turnover to show leadership what the current schedule really costs
Find the capacity hiding in your current equipment and schedules, so you grow output and shorten lead times before you spend on new capital
Design schedules that flex production hours with demand (at Pella, from 80 to 119 hours a week) without adding an entire shift
Survey and involve the workforce so employees help choose the schedule, with union language worked out away from the bargaining table, then support implementation until the new schedule is simply how the plant runs
Typical results
"increased our capacity by 25%", "reduced the lead order time from 15 days to 5" and "improved productivity by 9% in the first year", while avoiding "capital expenditures of nearly $1 million" (Cadet Manufacturing testimonial)
"+18% average output within a month" and "More than 50% reduction in turnover" (Pella Corporation, Murray, KY Results story)
Plant capacity up "without increasing our headcount", with "efficiencies increased 17%" and "total plant output increased by 13% in just two months" (AlliedSignal letter, Jerry Jurkiewicz, Operations Manager, 1998)
"$10 million+ in annual cost savings and avoidance" at an "800%+ annual ROI" (BMW)
Server on-time delivery improved "from 67% to over 95%" (Unisys letter)
"capture a combined $4.8 million in savings, due largely to the synergistic energy between Coleman Consulting Group and Kaiser Aluminum" (Kaiser Aluminum letter, Wayne Hale, Vice President, 2000)
What clients say
Under the direction of Coleman Consulting Group, we went through a major schedule change and at the same time started a quality process. Productivity improved. I'd say we easily got a 2 or 3 percent increase, even in our paper machines, our most continuous area. Absenteeism improved substantially-about 30 percent better. Turnover also improved by 50 percent.
Karl Meyers, Plant Manager, Fort James Paper Company
Your system of deploying our capital and personnel immediately increased our plant capacity without increasing our headcount. Additionally, the added flexibility has allowed us to synchronize the factory on a day to day basis. Consequently our efficiencies increased 17% and total plant output increased by 13% in just two months.
Jerry Jurkiewicz, Operations Manager, AlliedSignal Turbocharging Systems (1998)
Working with unions
"Unlike other consultants they worked well with our local union. The union was involved in every step of the process." (Brian M. Marcheson, UAW Corporate Joint Programs Representative (American Axle & Manufacturing)) | Gallo Glass: "85% union approval after six months"; GMP Local 17 reports that after a one year trial "over 90% voted to keep the new schedule" | /what-we-do/union-environments
In the news
Warroad Pioneer, 2001: Marvin Windows and Doors brought in CCG for a shift change affecting nearly 3,000 people, and let employees drive the choice. The schedule they picked rotates three weeks of days and one week of evenings on 10-hour shifts. Night work is cut in half, the rotation builds in a five-day break once a month, and people know their schedule a year in advance, including overtime. "The beauty of this schedule is people will know their schedule for an entire year including anticipated overtime." (Brenda Baumann, Communication Manager, Marvin Windows and Doors (Warroad Pioneer, 2001))
Next step
Is overtime eating your output? Schedule a 30-minute workforce diagnostic.
