More than $10 million a year saved, at over 800% ROI

More than $10 million a year saved, at over 800% ROI

BMW

Manufacturing

$10M+

in annual cost savings and cost avoidance

800%+

annual ROI

6

operations analyzed

The problem

Spartanburg built the Z3 and X5 under a very dynamic workload driven by customer demand, model changes, supplier problems, and a wide range of options. Matching labor to that workload was hard, so the plant had high levels of both overstaffing and overtime. Shifts had no face-to-face handoff, and absenteeism put lines at risk.

What we did

  • Analyzed six separate operations (Z3 and X5 body, paint, Z3 and X5 assembly, final test)
  • Showed that an extra hour of overtime cost less than an hour of straight time, and balanced that against burnout
  • Designed flexible schedules to match the workforce to the workload
  • Added small, staggered shift overlaps for live handoffs, continuous equipment running, and absence coverage

The results

  • $10 million+ in annual cost savings and avoidance from overtime and break-time policy changes
  • 800%+ annual ROI
  • Lower risk of lines going down from absenteeism
  • More days off and greater predictability for associates
  • Further process and staffing efficiencies implemented (not formally measured)

​

Paying for overstaffing and overtime at the same time? Get a 30-minute workforce diagnostic.