$500K saved right away by changing supervisor schedules
Southern California Edison
Utilities
$500K
Flexibility
$6M+
saved immediately from changing supervisor schedules
to run the plants
additional savings potential
The problem
Southern California Edison needed a fuller set of scheduling options as the competitive environment tightened, and more flexibility to run its plants. Leadership also needed schedule changes that could deliver savings without waiting on a long build-out.
What we did
- Delivered a complete set of scheduling options Edison could deploy as competition increased
- Changed supervisor schedules in a way that produced immediate savings
- Introduced additional concepts Edison could use for further savings and more plant flexibility
The results
- $500,000 saved immediately from changing supervisor schedules
- More flexibility to run the plants
- At least $6 million in additional savings available from other concepts (potential; not a captured result)
We easily saved a half-million dollars from changing supervisor schedules immediately; and using other concepts, there are savings of at least an additional $6 million. Coleman Consulting Group brings experience, expertise and solutions to Southern California Edison that were difficult for us to obtain on our own and to us that is of value. I am pleased with the work. We have more flexibility to run our plants.
Larry Hamlin, Vice President, Southern California Edison