top of page

BACKGROUND

This small operations service center supporting Florida Power & Light field operators has 10 employees working a 168-40 or 42 schedule. Shifts range from 8-10-12, multi-crew, unbalanced, both fixed and rotating. Days off are unpredictable, and overtime is both voluntary and mandatory depending on circumstances. Covid-19 caused workers to be remote for a time, but Coleman Consulting Group was hired to bring stability and predictability to the schedule to increase efficiency and to improve employee engagement. 

CASE STUDY:
     Florida Power & Light 

 

 

 

 

 

 

INDUSTRY:   Utilities 

EMPLOYEES: 10 full-time

 LOCATION : Palm Beach, FL 

​

 

THE CHALLENGE

this page under construction

THE RESULTS

this page under construction

​

THE SOLUTION

this page under construction 

"insert quote from someone at FPL "    

​

corporate office:

1101 Fifth Avenue, suite 345 

San Rafael, CA 94901

888-823-0810  or  415-453-8500

contact: info@coleman-consulting.com 

Join our mailing list

Never miss an update

© 2025 by Coleman Consulting Group

bottom of page